Saturday 7 December 2013

Fit-out progress ... twelfth instalment (late November 2013)

We're into the final few weeks of the fit-out in late November 2013, and things are progressing really well with all of the finishing-off tasks by Rob and the lads.

First of all, there has been fabulous progress in the saloon, with all of the woodwork now having been varnished with the grain coming out wonderfully.  See also the tiling in the kitchen which looks good.   

The bedroom under the tug deck is really coming along ... lots of work by Rob in getting the fit-out to align with the gentle rise on the tug deck, as hopefully you can see from the pictures below.  Dean has also spent a long time under there to finish and varnish the wood, and the outcome of all of that hard work is there to see. 




Further on down in the kitchen and bathroom, the kitchen tap has now been fitted, the large cupboard is looking great, and see the bathroom basin (with the finished top splash surface) and shower cubicle.





See below the way in which Rob has built the prisms into the saloon and kitchen ceiling, which makes the very best of the extra light which the prisms provide ... just fabulous.



And now to some of the external pieces, and see below how the mouldings have been built into the recessed panels, which look superb.






And some extra pieces below ... including the inside and rear doors ready for Dave Moore's decoration, and of the stern prepped for painting.  Also, just look at the fabulous chimneys from Andy Hoyle from FMC Dove; a lovely quality and traditional job.








  