Sunday 11 November 2012

Steelwork finished ...

The boat's steelwork is now finished, and work remains on installation of the engine, with the details below recorded on 3 November 2012 ...


The beautiful shape of the Norton Canes anser pin ... look at the "nails", and on the dolly below  ...



The engine installation is well underway, and it looks fabulous now it's in situ in the boat ... and note the temporary bulkhead that has been put in place so that we can sail the boat around to the boat fitters.


Another work of art in the "swan's neck", or "ram's head" as some others refer to it.