Fit-out progress ... eighth instalment (August 2013)

Two visits in August, with the second visit pictures (immediately below) showing good progress with the kitchen and note the side steps being built, and also the surround for the boatman's stove.






Work on the kitchen is the focus of attention, and here are some pictures of the kitchen cupboard doors, each hand-made by Rob, and the beech worktop ...






Fit-out progress ... seventh instalment (July 2013)

There has been lots of progress during the summer months, as the boatman's cabin is finished off, the engine room gets "scumbled and scalloped", and the kitchen starts to take shape ...











Fit-out progress ... sixth instalment (May 2013)

Progress continues with the scumbling of the Boatman's cabin ... as at May 2013 ... and look at the wonderful forming which Rob has carried out on the rear hatch.









Fit-out progress ... fifth instalment (May 2013)

There is good progress on the boatman's cabin, which has been undercoated, and the engine room cupboards start to form (as at May 2013).





Fit-out progress ... fourth instalment (April 2013)

The boatman's cabin continues to be progressed, and also the engine room, and the finishing of the ceiling in the saloon (as at April 2013) ...




Fit-out progress ... third instalment (March 2013)

The boatman's cabin starts to be built in March 2013 ... and just look how wonderful it is, a real traditional job.  A picture of the boat outside first ...









Fit-out progress ... second instalment (February 2013)

The lining out of the boat had commenced from February 2013 onwards, as shown in the following pictures ...





First photographs from the fit-out (December 2012)

The fit-out of the boat began in late December 2012 by Rob Bryan at his workshop at Ashby Boats on the Ashby Canal.  Here are some of the images.

The boat has arrived at the workshop, and this picture was taken on New Year's Eve, 2012.



The boat then progressed into the polytunnel, with these pictures taken on 12 January 2013, when battening-out had started ...