The picture on the left shows the engine packed and ready for the journey to Norton Canes, which took place at the end of May 2012. It wasn't an easy job as the engine hoist wasn't anywhere near big enough, but with the skills of the father-in-law we managed to get the engine to the yard (also courtesy of a trailer from Barlows Trailers)
This shows the gearbox linkage system which Dick has rigged up for the engine. I tried to find the original casting and rang Seward Engineering but, not surprisingly, they didn't have one in stock! Dick's arrangement, once painted, will look the part and will do the job really well.
Here's the engine with the gear linkage system, which of course allows the engine to be moved forward and reverse from trad controls at the rear of the boat.
Saturday, 14 July 2012
Sunday, 10 June 2012
The shell begins to take shape ...
We visited Norton Canes on 28 May 2012 to drop the engine off with Graham and Tony, and to take a look at progress with the shell. The pictures below show the current state of play, with a nice close up of the counter (and great picture of Tony!):
Tuesday, 29 May 2012
Engine renovation nears completion
Things tend not to go exactly to plan with Kelvin renovations, and our engine was just the same with some trials and tribulations especially with water leaks from water pipes. Luckily, Dick Goble had a solution which I sincerely hope will cure the problem and seal the leaks once and for all. This was to add small spigotted flanges (if that's the appropriate term) to each of the cylinder inlets, in order to replace the damaged and pitted faces. There are a few pictures below:
As you can see from the picture, the inlet (or are they outlet?) faces on the cylinders were pitted quite badly, which caused difficulty in achieving a water tight seal. As well as the small spigotted flanges, we used "milliput" to fill some of the bigger pits in the face, and a decent gasket also of course, to produce a good "sandwich" which will hopefully seal well.
Here are also some pictures of the engine packed up and ready for the transit to Norton Canes, which took place on Monday 28 May 2012, using a hired horse box! from Barlows Trailers and lots of pushing and shoving with the engine hoist!
![]() |
| The pitted cylinder inlet face |
Here are also some pictures of the engine packed up and ready for the transit to Norton Canes, which took place on Monday 28 May 2012, using a hired horse box! from Barlows Trailers and lots of pushing and shoving with the engine hoist!
First shell pictures
This post will be a bit of a catch-up for a few weeks, as we have seen the shell start to be built and the engine renovation having been completed as far as possible.
First for the shell, and it's Norton Canes tug style shell, built by Graham Edgson and Tony Bate at Pelsall, at 60' length. The early stages of the shell have now been completed as per the first real visit early in May 2012. Whilst it is early days, you can already see the fine steelwork and super lines of the NC build. The bow has a 5'6" section, together with an 8' tug deck, you can see that the lines will be wonderful at the front.
First for the shell, and it's Norton Canes tug style shell, built by Graham Edgson and Tony Bate at Pelsall, at 60' length. The early stages of the shell have now been completed as per the first real visit early in May 2012. Whilst it is early days, you can already see the fine steelwork and super lines of the NC build. The bow has a 5'6" section, together with an 8' tug deck, you can see that the lines will be wonderful at the front.
Saturday, 14 April 2012
Recon to gearbox ...
The rebuild and refurb of the engine has progressed in recenrt weeks, with the main jobs being the reconditioning of the gearbox and the removal of the cylinder heads so that they can be cleaned and refurbished. The gearbox on my J3 is the steel on steel type ... some come with ferodo lining on the facings ... and the work has involved putting new chains within the gearbox which hopefully will last a long time into the future! The output shaft from the gearbox has also been machined back to the original size (which I believe is 1 and five-eighths of an inch), as in the attached photograph:
The small sprocket in the photograph is, of course, used to connect - by chain - to the forward and reverse gearwheel which will be at the back for the steerer (connected via a rod and rack and pinion).
The small sprocket in the photograph is, of course, used to connect - by chain - to the forward and reverse gearwheel which will be at the back for the steerer (connected via a rod and rack and pinion).
Monday, 23 January 2012
More pictures for the record
So far things have been pretty routine as far as the overhaul [famous last words!], and I look forward to the point where we can start putting the parts back on the engine and building it up! ... that will happen before too long.
It can be seen from the third of these pictures just how coked-up the exhaust ports were on the engine, which can't have helped with the efficiency of the engine. This means that we will have to take the cylinder heads off to look further at the valves, as they may similarly be coked-up.
Monday, 2 January 2012
The Kelvin J3 in pictures
It's important to take pictures during any engine overhaul, and I've tried to do this so as to (i) remember how everything goes back together [although to be fair I am also very much relying on expert help!] and (ii) to see the changes in the engine during the period of the refurbishment. After having checked the engine for major problems and having undertaken a pressure test of the cylinders which appeared satisfactory, the plan has been to overhaul the key components of the engine such as the water pump, governor, injection pump, magneto etc. I set out below some of pictures of these parts as certainly during this rebuild it has been difficult to find good pictures of these from other engines:
Many of the engine parts have been ... or shortly will be ... rerubished in the period before the shell is ready, and in the following post I show some of the parts that have been overhauled.

Many of the engine parts have been ... or shortly will be ... rerubished in the period before the shell is ready, and in the following post I show some of the parts that have been overhauled.